Any Patch Panel will mount on these products (Up to 2U)

EZMS2 - Network Shelf

ezms2The EZ Mount Network Shelf 2

You asked for it and we listened! New Size

The EZMS2 is deeper than the original.  It was created because "We Listen" and Cisco users required a wall mount deeper than 16 inches offered by the flagship model.  It is 22 inches deep and holds a 24-48 port patch panel, rack mount power strip underneath and can be expanded to mount an extra patch panel or provide two extra rack mount units by adding an EZMBS underneath.  The size is 11 inches high by 22 inches deep by 19 1/2 inches wide and is made of steel with a black wrinkle finish.

Specs

EZMS2 EZ Mount Network Shelf
Dimensions: 19 3/16" Wide x 22" Deep x 9" High (Shelf 20 1/2" Deep).
Compatible With (not included) One or two 12 or 24 port patch panels or one 48 port patch panel. (To expand two (2) RMS, see "OPTION" below.)
Weight Spec: When properly mounted, will support up to 100 lb.
Power Strip (not included) Mounting holes provided on underside for one (1) rack mount power strip.
Mounting Holes: 6 3/4" key-hole mounting holes for 16" on center mounting.  8 mounting slots on 18 1/2" centers for mounting on relay rack.
Package Includes: Package of eight (8) 10-32 screws, one (1) ground screw, four (4) 6" Velcro strips (24" total), Blank Plate, Mounting Template.  Slots provided on shelf deck for equipment tie down with Velcro straps (Not included).
Option: EZ Mount Swivel Bracket to expand two (2) rack spaces (P/N:  EZMBS).
Warranty Against defects in materials and manufacturing


Instructions for Use

To mount the shelf for initial installation of network components:

  1. Mark wall w/template.
  2. Mount shelf on wall with four screws.
  3. Attach patch panel(s), blank plate, and power strip to shelf as desired, using 10-32 screws provided.
  4. Insert Velcro (included) in side slots provided to manage station cables (see diagram below).

To rotate patch panel(s) for easy wire connections:

  1. Pull plunger assembly on each side of shelf AND turn counterclockwise until the plunger locks open.
  2. Rotate top of patch panel downward until backside is exposed.
  3. To release plunger assemblies, turn clockwise and lock patch panel in reverse position.
  4. Position wire manager as desired.
  5. Allow enough slack when installing cable to allow patch panel to swivel into its original position.

To return patch panel(s) to functional position:

  1. Pull plunger assembly on each side of shelf AND turn counterclockwise until the plunger locks open.
  2. Rotate bottom of patch panel upward until front of patch panel is exposed.
  3. To release plunger assemblies, turn clockwise and lock patch panel in functional position.

NOTE:  Patch Panel(s) and Power Strip are USER Supplied.

 

You are here:   iNNOdata LTD >> Product Line >> EZMS2-Network Shelf

iNNOdata LTD

  • PO Box 12276
  • Casa Grande, AZ 85130 USA
  • Toll free: 888.334.3930
  • Local: 520-421-9300

Search Our Site

Proud Member

BICSI

corpmember

Proud Member

Association of Cabling Professionals

ACP